Good progress continues at Tyseley on the overhaul of Bradley Manor including:

Valve gear - expansion links re-machined, new die blocks underway & most parts cleaned up for examination & painting.

Brake Rigging - with new bolts & other parts in stock & rebushing of reusable components underway.

Mainframes - cleaning & painting continues.

7802

The bogie - the tyres have now been turned, the springs are away for reconditioning and all the component parts are being cleaned, examined and painted.

7802

Driving wheels - 2 sets now have fresh paint - one set in undercoat the other in first coat of primer.

7802

7802

Meanwhile at Bridgnorth work is underway on the boiler by paid staff and volunteers - boiler tubes & steel stays are being removed in preparation for a thorough examination.

February 2012 Updates

7802

7802

After weeks of cleaning and scraping, painting of Bradley's driving wheels has started at Tyseley. Photographed 25th February.

7802

7802 alongside 6201 and classmate 7820 at Tyseley works.

7802

Bogie steam cleaned prior to dismantling.

7802

Driving wheels partly prepared for painting - more work required.

7802

Dave Kilner applying second coat of primer to frames.

7802

Members of working party enjoying a short break in February sun.

7802

Members of working party working on frames.

7802

Preparing the frames for more painting.

7802

Preparing the driving wheels for painting.

January 2012 Update

7802

7802's separated frames and wheels flanked by dignified company, Clun Castle's boiler and Princess Elizabeth. Photo: Gerald Peacock

7802

Preparing to dismantle 7802's bogie. Photo: Gerald Peacock

7802

Dismantling the bogie for axle box overhaul. Photo: Gerald Peacock

7802

Progress on the production of new brake rigging bolts for 7802.

The Chassis is moved to Tyseley

7802

Together with 7802's tender and 46443, both for temporary storage, 7802’s chassis arrives at Kidderminster 27th October en route to Tyseley for overhaul. Photo: Richard Shaw.

7802

7802

7802’s chassis being offloaded at Tyseley on 28th October. Photos: Dave Kilner

7802 Bradley Manor - the boiler is lifted

The Erlestoke Manor Fund (EMF) was pleased to welcome its Appeal Patron, Gareth Jones, to the Severn Valley Railway (SVR) on Friday 14th October to see Bradley’s boiler lifted from the frames. Gareth was closely involved with the Manors on the Cambrian for many years and during the course of the day he related several interesting stories and anecdotes – more on these another time. 

During the previous weeks volunteers had removed all the cab fittings, lubrication pipe work, blast pipe and superheater header.  On Saturday 8th October a working party stripped the cladding and insulation from the boiler ready for the boiler lift the following week.

Bradley Manor was shunted around to the boiler shop on the Thursday and a good group of volunteers arrived early on the Friday morning to assist with the lift; Graham Beddow, SVR Boiler Shop Foreman, was present all day to direct operations.

The Cab roof and chimney were removed during the course of the morning and by mid-afternoon the boiler was out of the frames and on a wagon.  The cab roof was then replaced on the chassis and the loco was removed from the boilershop. 

By chance Erlestoke Manor had arrived from Bewdley and appropriately it took Bradley’s chassis back around to the MPD Yard, where cleaning will continue for the next couple of weeks.  Later this month Bradley will be moved to Tyseley Locomotive Works for a full mechanical overhaul, which is due to be completed by late spring / early summer 2012.

The boiler will remain at the SVR and volunteers will be stripping it over the coming months so that a full assessment can be undertaken to establish the scale of repairs required. 

An appeal is already well underway to raise funds to ensure that the overhaul can be completed as soon as possible and enable Bradley Manor to be back in action on the SVR, alongside Erlestoke Manor.

7802

7802 stripped and ready to enter the boilershop.

7802

First, the cab roof is removed.

7802

The boiler is lifted clear of the frames with Appeal Patron, Gareth Jones, looking on.

7802

Appeal Patron, Gareth Jones (left) and EMF Newsletter editor, David Kilner, holding Bradley's name plate.

7802

Erlestoke Manor had arrived from Bewdley and appropriately took Bradley’s chassis back around to the MPD Yard, where cleaning will continue for the next couple of weeks. All photos: Des Ainsworth.

 

®2007-2011 Erlestoke Manor Fund
Bradley Manor